Tariff Monitor
U.S. Imports of Lamps and LED lighting From Malaysia
In 2025, U.S. importers brought in $34.0M of lamps and led lighting from Malaysia; the reported effective calculated-duty rate was 10.35% for that flow. That makes Malaysia the 9th-largest named source of this family, at 1.6% of tracked lamps and led lighting imports. The family-wide effective calculated-duty rate is 18.24%, so Malaysia's observed rate is 7.9 points less than average. Freight and insurance add 3.28% on top of customs value. Tracked-family figures are a floor on total bilateral trade.
The current reading
- Import value: $34.0M of lamps and led lighting from Malaysia in 2025, customs value.
- Observed effective calculated-duty rate: 10.35%, reported Calculated Duties ÷ covered customs value, 7.9 points below the 18.24% family average.
- Share of the family: 1.6%, #9 named source of lamps and led lighting.
- Reported freight and insurance: 3.28% of customs value, shown alongside the effective calculated-duty rate.
- History depth: 3 years of annual named-source boards.
Frequently asked questions
- What tariff does the U.S. charge on lamps and led lighting from Malaysia? In 2025, the reported effective calculated-duty rate was 10.35% for lamps and led lighting imported from Malaysia, calculated as reported Calculated Duties divided by covered customs value. It reflects the observed entry mix but does not identify the legal cause of the rate or determine an entry-specific duty.
- How much lamps and led lighting does the U.S. import from Malaysia? The U.S. imported $34.0M of lamps and led lighting from Malaysia in 2025, 1.6% of the tracked lamps and led lighting it imports, ranking Malaysia the 9th-largest named source. The chart above traces the retained reported years; a year with no retained source row is unknown, not zero.
- What does freight add on lamps and led lighting from Malaysia? Cost, insurance, and freight ran 3.28% of customs value on lamps and led lighting from Malaysia in 2025. That is an additional import burden alongside the reported effective calculated-duty rate; a country-specific invoice price is still required for a comparable landed unit cost.
About this data
- Reference statistics derived from USITC published data. Not a customs ruling. MFN-Free and Special-rate fields describe statutory line coverage only; final entry liability requires origin, date, eligibility, exclusions and other transaction facts. Calculated Duties are statistical estimates, not a cash-collections ledger. Confirm classification, origin, program eligibility, and final entry liability with a licensed customs broker.
Last reviewed 2026-10-01.