In 2025, U.S. importers brought in $99.5B of goods from Mexico across 57 manufacturing families MFG Calcs tracks, carrying an effective calculated-duty rate of 4.87%, up from 0.4% the year before. Mexico's largest tracked categories: insulated wire and cable, switchgear, connectors, and controls, internal combustion engines. Tracked-family totals are a floor on total bilateral trade, from USITC DataWeb data.
The current reading
Tracked imports from Mexico: $99.5B in 2025 across 57 manufacturing families, a floor on total bilateral trade.
Observed effective calculated-duty rate: 4.87% (0.4% the year before), reported Calculated Duties ÷ covered customs value.
History depth: 12 years of annual named-source boards.
Largest tracked families from Mexico
Insulated wire and cable
Switchgear, connectors, and controls
Internal combustion engines
Transformers and power supplies
Electric motors and generators
Frequently asked questions
How much does the U.S. import from Mexico? U.S. imports from Mexico totaled $99.5B in customs value in 2025, across the 57 manufacturing material and equipment families MFG Calcs tracks. That is a floor on total bilateral trade. It excludes manufacturing products outside the tracked family universe.
What effective calculated-duty rate is observed for imports from Mexico? In 2025, imports from Mexico had an effective calculated-duty rate of 4.87% across tracked families. The rate is reported Calculated Duties divided by the customs value covered by those duty observations, which reflects the combined product, origin, preference and tariff mix in USITC's statistics. A year earlier the rate was 0.4%.
What does the U.S. import most from Mexico? Among tracked manufacturing families, Mexico's largest recent categories are insulated wire and cable, switchgear, connectors, and controls, internal combustion engines, transformers and power supplies. Each has its own live rate page linked below.
Is the tariff burden on Mexico rising or falling? Rising: the effective rate on tracked imports from Mexico moved +4.5 points year over year to 4.87% in 2025. Monthly family-level detail is on each linked family page.
About this data
Reference statistics derived from USITC published data. Not a customs ruling. MFN-Free and Special-rate fields describe statutory line coverage only; final entry liability requires origin, date, eligibility, exclusions and other transaction facts. Calculated Duties are statistical estimates, not a cash-collections ledger. Confirm classification, origin, program eligibility, and final entry liability with a licensed customs broker.