Tariff Monitor
U.S. Imports of Transformers and power supplies From Philippines
In 2025, U.S. importers brought in $674.6M of transformers and power supplies from Philippines; the reported effective calculated-duty rate was 9.08% for that flow. That makes Philippines the 14th-largest named source of this family, at 2.1% of tracked transformers and power supplies imports. The family-wide effective calculated-duty rate is 11.52%, so Philippines's observed rate is 2.4 points less than average. Freight and insurance add 2.77% on top of customs value. Tracked-family figures are a floor on total bilateral trade.
The current reading
- Import value: $674.6M of transformers and power supplies from Philippines in 2025, customs value.
- Observed effective calculated-duty rate: 9.08%, reported Calculated Duties ÷ covered customs value, 2.4 points below the 11.52% family average.
- Share of the family: 2.1%, #14 named source of transformers and power supplies.
- Reported freight and insurance: 2.77% of customs value, shown alongside the effective calculated-duty rate.
- History depth: 5 years of annual named-source boards.
Frequently asked questions
- What tariff does the U.S. charge on transformers and power supplies from Philippines? In 2025, the reported effective calculated-duty rate was 9.08% for transformers and power supplies imported from Philippines, calculated as reported Calculated Duties divided by covered customs value. It reflects the observed entry mix but does not identify the legal cause of the rate or determine an entry-specific duty.
- How much transformers and power supplies does the U.S. import from Philippines? The U.S. imported $674.6M of transformers and power supplies from Philippines in 2025, 2.1% of the tracked transformers and power supplies it imports, ranking Philippines the 14th-largest named source. The chart above traces the retained reported years; a year with no retained source row is unknown, not zero.
- What does freight add on transformers and power supplies from Philippines? Cost, insurance, and freight ran 2.77% of customs value on transformers and power supplies from Philippines in 2025. That is an additional import burden alongside the reported effective calculated-duty rate; a country-specific invoice price is still required for a comparable landed unit cost.
About this data
- Reference statistics derived from USITC published data. Not a customs ruling. MFN-Free and Special-rate fields describe statutory line coverage only; final entry liability requires origin, date, eligibility, exclusions and other transaction facts. Calculated Duties are statistical estimates, not a cash-collections ledger. Confirm classification, origin, program eligibility, and final entry liability with a licensed customs broker.
Last reviewed 2026-10-01.