Tariff Monitor

U.S. Imports of Nickel and nickel alloys From Russia

In 2022, U.S. importers brought in $270.1M of nickel and nickel alloys from Russia; the reported effective calculated-duty rate was 0.06% for that flow. That makes Russia the 4th-largest named source of this family, at 8% of tracked nickel and nickel alloys imports. The family-wide effective calculated-duty rate is 0.76%, so Russia's observed rate is 0.7 points less than average. Tracked-family figures are a floor on total bilateral trade.

The current reading

  • Import value: $270.1M of nickel and nickel alloys from Russia in 2022, customs value.
  • Observed effective calculated-duty rate: 0.06%, reported Calculated Duties ÷ covered customs value, 0.7 points below the 0.76% family average.
  • Share of the family: 8%, #4 named source of nickel and nickel alloys.
  • History depth: 9 years of annual named-source boards.

Frequently asked questions

  • What tariff does the U.S. charge on nickel and nickel alloys from Russia? In 2022, the reported effective calculated-duty rate was 0.06% for nickel and nickel alloys imported from Russia, calculated as reported Calculated Duties divided by covered customs value. It reflects the observed entry mix but does not identify the legal cause of the rate or determine an entry-specific duty.
  • How much nickel and nickel alloys does the U.S. import from Russia? The U.S. imported $270.1M of nickel and nickel alloys from Russia in 2022, 8% of the tracked nickel and nickel alloys it imports, ranking Russia the 4th-largest named source. The chart above traces the retained reported years; a year with no retained source row is unknown, not zero.

About this data

  • Reference statistics derived from USITC published data. Not a customs ruling. MFN-Free and Special-rate fields describe statutory line coverage only; final entry liability requires origin, date, eligibility, exclusions and other transaction facts. Calculated Duties are statistical estimates, not a cash-collections ledger. Confirm classification, origin, program eligibility, and final entry liability with a licensed customs broker.

Last reviewed 2026-10-01.