Tariff Monitor

U.S. Imports of Steel pipe and tube From Thailand

In 2025, U.S. importers brought in $86.0M of steel pipe and tube from Thailand; the reported effective calculated-duty rate was 29.37% for that flow. That makes Thailand the 19th-largest named source of this family, at 1.2% of tracked steel pipe and tube imports. The family-wide effective calculated-duty rate is 25.63%, so Thailand's observed rate is 3.7 points more than average. Freight and insurance add 13.88% on top of customs value. Tracked-family figures are a floor on total bilateral trade.

The current reading

  • Import value: $86.0M of steel pipe and tube from Thailand in 2025, customs value.
  • Observed effective calculated-duty rate: 29.37%, reported Calculated Duties ÷ covered customs value, 3.7 points above the 25.63% family average.
  • Share of the family: 1.2%, #19 named source of steel pipe and tube.
  • Reported freight and insurance: 13.88% of customs value, shown alongside the effective calculated-duty rate.
  • History depth: 3 years of annual named-source boards.

Frequently asked questions

  • What tariff does the U.S. charge on steel pipe and tube from Thailand? In 2025, the reported effective calculated-duty rate was 29.37% for steel pipe and tube imported from Thailand, calculated as reported Calculated Duties divided by covered customs value. It reflects the observed entry mix but does not identify the legal cause of the rate or determine an entry-specific duty.
  • How much steel pipe and tube does the U.S. import from Thailand? The U.S. imported $86.0M of steel pipe and tube from Thailand in 2025, 1.2% of the tracked steel pipe and tube it imports, ranking Thailand the 19th-largest named source. The chart above traces the retained reported years; a year with no retained source row is unknown, not zero.
  • What does freight add on steel pipe and tube from Thailand? Cost, insurance, and freight ran 13.88% of customs value on steel pipe and tube from Thailand in 2025. That is an additional import burden alongside the reported effective calculated-duty rate; a country-specific invoice price is still required for a comparable landed unit cost.

About this data

  • Reference statistics derived from USITC published data. Not a customs ruling. MFN-Free and Special-rate fields describe statutory line coverage only; final entry liability requires origin, date, eligibility, exclusions and other transaction facts. Calculated Duties are statistical estimates, not a cash-collections ledger. Confirm classification, origin, program eligibility, and final entry liability with a licensed customs broker.

Last reviewed 2026-10-01.