Tariff Monitor

Tariffs on Imports From Uganda

In 2025, U.S. importers brought in $38K of goods from Uganda across 5 manufacturing families MFG Calcs tracks, carrying an effective calculated-duty rate of 7.95%, up from 0.56% the year before. Uganda's largest tracked categories: transformers and power supplies, semiconductors and integrated circuits, robots and automated machinery. Tracked-family totals are a floor on total bilateral trade, from USITC DataWeb data.

The current reading

  • Tracked imports from Uganda: $38K in 2025 across 5 manufacturing families, a floor on total bilateral trade.
  • Observed effective calculated-duty rate: 7.95% (0.56% the year before), reported Calculated Duties ÷ covered customs value.
  • History depth: 2 years of annual named-source boards.

Largest tracked families from Uganda

  • Transformers and power supplies
  • Semiconductors and integrated circuits
  • Robots and automated machinery
  • Heat exchange and process heating
  • Switchgear, connectors, and controls

Frequently asked questions

  • How much does the U.S. import from Uganda? U.S. imports from Uganda totaled $38K in customs value in 2025, across the 5 manufacturing material and equipment families MFG Calcs tracks. That is a floor on total bilateral trade. It excludes manufacturing products outside the tracked family universe.
  • What effective calculated-duty rate is observed for imports from Uganda? In 2025, imports from Uganda had an effective calculated-duty rate of 7.95% across tracked families. The rate is reported Calculated Duties divided by the customs value covered by those duty observations, which reflects the combined product, origin, preference and tariff mix in USITC's statistics. A year earlier the rate was 0.56%.
  • What does the U.S. import most from Uganda? Among tracked manufacturing families, Uganda's largest recent categories are transformers and power supplies, semiconductors and integrated circuits, robots and automated machinery, heat exchange and process heating. Each has its own live rate page linked below.
  • Is the tariff burden on Uganda rising or falling? Rising: the effective rate on tracked imports from Uganda moved +7.4 points year over year to 7.95% in 2025. Monthly family-level detail is on each linked family page.

About this data

  • Reference statistics derived from USITC published data. Not a customs ruling. MFN-Free and Special-rate fields describe statutory line coverage only; final entry liability requires origin, date, eligibility, exclusions and other transaction facts. Calculated Duties are statistical estimates, not a cash-collections ledger. Confirm classification, origin, program eligibility, and final entry liability with a licensed customs broker.

Last reviewed 2026-10-01.