Tariff Monitor
Tariffs on Imports From Uruguay
In 2025, U.S. importers brought in $6.2M of goods from Uruguay across 28 manufacturing families MFG Calcs tracks, carrying an effective calculated-duty rate of 6.73%, up from 2.31% the year before. Uruguay's largest tracked categories: batteries and storage cells, transformers and power supplies, compressors and fans. Tracked-family totals are a floor on total bilateral trade, from USITC DataWeb data.
The current reading
- Tracked imports from Uruguay: $6.2M in 2025 across 28 manufacturing families, a floor on total bilateral trade.
- Observed effective calculated-duty rate: 6.73% (2.31% the year before), reported Calculated Duties ÷ covered customs value.
- History depth: 2 years of annual named-source boards.
Largest tracked families from Uruguay
- Batteries and storage cells
- Transformers and power supplies
- Compressors and fans
- Robots and automated machinery
- Pumps for liquids
Frequently asked questions
- How much does the U.S. import from Uruguay? U.S. imports from Uruguay totaled $6.2M in customs value in 2025, across the 28 manufacturing material and equipment families MFG Calcs tracks. That is a floor on total bilateral trade. It excludes manufacturing products outside the tracked family universe.
- What effective calculated-duty rate is observed for imports from Uruguay? In 2025, imports from Uruguay had an effective calculated-duty rate of 6.73% across tracked families. The rate is reported Calculated Duties divided by the customs value covered by those duty observations, which reflects the combined product, origin, preference and tariff mix in USITC's statistics. A year earlier the rate was 2.31%.
- What does the U.S. import most from Uruguay? Among tracked manufacturing families, Uruguay's largest recent categories are batteries and storage cells, transformers and power supplies, compressors and fans, robots and automated machinery. Each has its own live rate page linked below.
- Is the tariff burden on Uruguay rising or falling? Rising: the effective rate on tracked imports from Uruguay moved +4.4 points year over year to 6.73% in 2025. Monthly family-level detail is on each linked family page.
About this data
- Reference statistics derived from USITC published data. Not a customs ruling. MFN-Free and Special-rate fields describe statutory line coverage only; final entry liability requires origin, date, eligibility, exclusions and other transaction facts. Calculated Duties are statistical estimates, not a cash-collections ledger. Confirm classification, origin, program eligibility, and final entry liability with a licensed customs broker.
Last reviewed 2026-10-01.