Tariff monitor · Plastics & Polymers
Plastics in Primary Forms: Statutory & Effective Tariff Rates
USITC Column 1 General rates for 54 plastics in primary forms HTS lines (parseable range 0%–6.5%). Effective rate Aug 2026: 7.36%; monthly history since 2023.
The short answer
- The observed effective calculated-duty rate on U.S. imports of plastics in primary forms was 7.36% in Aug 2026, up from 4.29% a year earlier — USITC Calculated Duties divided by covered customs value. The Column 1 General line-rate range is 0%–6.5% across 54 HTS lines in the 2026 schedule; individual lines are called “Free” only when the official General field is literally Free, which still does not determine a shipment’s final duty. Canada is the largest source, holding 33.2% of 2025 imports.
Statutory rates from the schedule
- PE, PP, styrenics, PVC, acrylics, PET/polycarbonate, and nylon resins — injection molding feedstock. This family covers HTS headings 3901, 3902, 3903, 3904, 3906, 3907, 3908: 54 eight-digit rate lines with a parseable Column 1 General range of 0%–6.5% in the 2026 schedule. “Free” means the official General field is literally Free for that line; it does not determine final entry liability.
Observed calculated-duty data
- Latest month on record (2026-08): 7.36% effective on $1.2B of imports, versus 4.29% in the same month a year earlier. The monthly archive holds 44 observations from 2023-01 through 2026-08.
- In 2025, U.S. imports for consumption in this family totaled $12.5B in customs value, with $673.7M in USITC reported calculated duty on $12.5B of covered customs value: an effective calculated-duty rate of 5.39%. The aggregate reflects the recorded entry mix but does not attribute the result to a specific legal provision.
- A year earlier the effective calculated-duty rate was 2.87%, so the observed rate rose 2.5 points.
- Top source countries in 2025: Canada ($4.1B at 0.31%), South Korea ($1.5B at 5.14%), Mexico ($1.2B at 0.32%), Germany ($921.0M at 8.42%), Japan ($863.4M at 7.89%).
- Reported freight and insurance equaled 4.69% of covered customs value in 2025 ($585.9M total), from USITC DataWeb. It is shown alongside the effective calculated-duty rate and is not part of the customs-value duty base.
- Customs unit value: 1.6009 per kg in 2025, aggregate declared customs value divided by reported quantity across eligible single-unit lines (USITC DataWeb); not a transaction price.
- For scale, 2025 imports in this family equal 1.2% of the U.S. chemical products industry's $1.04T gross output (2025, BEA).
Representative rate lines
- 3901.10.10.00: Having a relative viscosity of 1.44 or more · MFN 6.5%
- 3901.10.50: Other · MFN 6.5%
- 3901.20.10.00: Having a relative viscosity of 1.44 or more · MFN 6.5%
- 3901.20.50.00: Other · MFN 6.5%
- 3901.30.20.00: Vinyl acetate-vinyl chloride-ethylene terpolymers, containing by weight less than 50 perce · MFN Free
- 3901.30.60.00: Other · MFN 5.3%
- 3901.40.00.00: Ethylene-alpha-olefin copolymers, having a specific gravity of less than 0.94 · MFN 6.5%
- 3901.90.10.00: Elastomeric · MFN Free
Frequently asked questions
- What is the U.S. tariff rate on plastics in primary forms? USITC calculated duties imply an effective rate of 7.36% in Aug 2026 (calculated duties ÷ covered customs value, USITC DataWeb). The parseable Column 1 General line-rate range is 0%–6.5%; individual lines are called “Free” only when the official General field is literally Free, and product, origin, preference and tariff mix can contribute to the observed-rate difference.
- What are the statutory MFN line rates for plastics in primary forms? The parseable Column 1 General line-rate range is 0%–6.5% across the family's 54 eight-digit HTS lines in the 2026 Harmonized Tariff Schedule (headings 3901, 3902, 3903, 3904, 3906, 3907, 3908). “Free” means the official General field is literally Free for a line; it does not determine final entry liability.
- Which countries supply the most plastics in primary forms to the U.S.? Top retained sources in 2025: Canada ($4.1B at 0.31%), South Korea ($1.5B at 5.14%), Mexico ($1.2B at 0.32%). Canada holds 33.2% of total family import customs value. Retained sources cover 82.2%; their HHI is 1480, a lower bound whose floor falls in the diversified range without classifying the omitted tail.
- How much plastics in primary forms does the U.S. import? $12.5B of customs value in 2025, with $673.7M in USITC Calculated Duties — an effective calculated-duty rate of 5.39%.
- Is the U.S. a net importer of plastics in primary forms? No — a net exporter in 2025: $12.5B imported vs $22.7B exported.
- What is the customs unit value of plastics in primary forms? $1.6/kg in 2025, derived as customs value ÷ reported quantity from USITC DataWeb. It is an aggregate across the family's product and origin mix, not a transaction price or supplier quote.
About this data
- Reference statistics derived from USITC published data. Not a customs ruling. MFN-Free and Special-rate fields describe statutory line coverage only; final entry liability requires origin, date, eligibility, exclusions and other transaction facts. Calculated Duties are statistical estimates, not a cash-collections ledger. Confirm classification, origin, program eligibility, and final entry liability with a licensed customs broker.
Last reviewed 2026-10-08.