Anodizing and Plating Rack Log Excel Template

Log every anodizing or plating order and see rack cycles, rack occupancy, first-pass yield and cost per good part against the price, by part, process and week.

Free, and a plain .xlsx with no macros to enable. A CSV with live formulas and a printed how-to guide come with it.

Overview

This anodizing and plating log is a working Excel workbook for finishing shop managers, line supervisors, quality engineers and estimators, and for buyers of finishing who want to check what they pay. It ships with six weeks of example orders for a fictional anodizing and plating shop with five processes and eight parts, so the dashboard and charts are populated the moment you open it; replace the example rows with your own and everything recalculates.

Each row is one order. You pick the part and the process and type the parts processed and the parts accepted first time. The workbook racks the order in whole rack cycles from the part's parts per rack, costs it from the process's cost per rack cycle and setup cost, and spreads that over the good parts the same way the Anodizing Cost per Part calculator on this site does, then sets it against the part's price. Every roll-up adds parts, slots and money before it divides, so the yield, occupancy and cost per good part of a part, a process or a week are never averages of percentages.

In practice, log each order when it comes off the line and review the dashboard weekly. The weekly reject rate shows a bath or rectifier problem the week it starts; cost per good part against price shows which parts lose money; and rack occupancy by part shows which orders leave racks part empty and spread the setup over too few parts.

What this template includes

Suggested use case

Use it to see which parts and orders cost more per good part than they earn, to show customers what part-empty racks and small orders cost, or to spot a bath or rectifier problem from the reject rate the week it starts.

How to use it

  1. On Setup, enter your shop name, currency and targets, then replace the example processes (cost per rack cycle and setup cost), parts (parts per rack and price) and defects.
  2. On Rack Log, add one row per order: part, process, parts processed, parts accepted first time and the main defect.
  3. Fix anything the Check column flags, such as more parts accepted than processed.
  4. Open the Dashboard and filter by part, process or dates.
  5. Use cost per good part against price to find work that loses money, and rack occupancy by part to find orders that leave racks part empty.

Frequently Asked Questions

How is the cost per good part calculated?
The order is racked in whole rack cycles, costed and spread over the parts accepted first time. 200 parts at 25 per rack is 8 rack cycles; at 40.00 a rack cycle that is 320.00, plus a 150.00 setup, for an order cost of 470.00. With 192 parts accepted first time, each good part costs 2.45, which is 0.55 under a 3.00 price, the same answer as the Anodizing Cost per Part calculator.
Why does rack occupancy matter?
A rack costs the same to run full or part empty. 210 parts at 25 per rack need 9 rack cycles, or 225 slots, so occupancy is 93.3 percent and 15 paid-for slots ran empty. At 40.00 a rack cycle and 150.00 setup the order costs 510.00, or 2.49 per good part with 205 accepted; up to 15 more parts could have ridden on the same nine racks.
How much do small orders cost per part?
The setup is charged once per order, so it weighs heavily on small ones. At 16 parts per rack, 46.00 a rack cycle and a 150.00 setup, an order of 32 front panels costs 242.00, or 7.81 per good part with 31 accepted; an order of 160 costs 610.00, or 3.91 per good part with 156 accepted. That gap is what a minimum lot charge is for.
What counts as first-pass accepted?
Parts that pass inspection the first time through, with no stripping, re-racking or touch-up. An order of 400 parts with 12 rejected has a 97.0 percent first-pass yield. The cost of the rejected parts stays in the order and raises its cost per good part; stripping and reprocessing them is a new order with its own row.
Can I use it if I buy anodizing or plating rather than run a line?
Yes. Type the finisher's quoted charge per rack cycle and setup charge as the process costs, and use the price per part column for the most you can pay per good part. Headroom then shows how far under or over that limit each order came in, as the cost limit headroom does in the Anodizing Cost per Part calculator.