HVAC Ductwork, Air Handling & Mechanical Products calculator

Duct Assembly Labor Calculator

Price direct assembly labor and setup for a duct job. Enter whole assemblies, measured person-hours per assembly, setup labor and your loaded hourly rate.

What this calculator does

  • Price direct assembly labor and setup for a duct job.

Formula used

  • Run labor = Assemblies × Person-hours per assembly
  • Total labor = Run labor + Setup labor
  • Labor cost = Total person-hours × Loaded hourly rate

Inputs explained

  • Assemblies: Whole duct or air-handler assemblies in the work order.
  • Run Labor per Assembly: Observed direct labor excluding separately entered setup.
  • Setup Labor: Planned staging and setup labor for this job.
  • Loaded Labor Rate: Wage and burden rate on the same labor basis.

How to use the result

  • Best suited to assembly quotes, setup labor budgets.
  • Material, equipment and allocated overhead outside the labor rate are excluded.

Current U.S. benchmarks

  • Industrial electricity averages 9.52 cents per kWh across the U.S. (EIA, Sep 2026), up 7% from a year earlier. Energy-intensive steps carry this directly into unit cost.
  • U.S. housing starts run at 1,309k per year (Census, Oct 2026), up 2.8% from a year earlier, the demand driver for building products.

Common questions

  • Should I enter elapsed crew hours? Convert crew time to total person-hours before entering the labor standard or setup.
  • What remains at zero assemblies? Entered setup labor still incurs its stated cost.
  • Does loaded labor include overhead? Use your defined wage and burden rate; do not add costs already included in it again.
  • Can setup dollars be entered as hours? No. Convert a supported labor estimate to person-hours or use the original monetary record elsewhere.

Last reviewed 2026-10-12.