Industrial Filtration, Separation & Dust Collection calculator

Fan Brake Horsepower Calculator

Calculate fan shaft power at a specified airflow and pressure rise. Use matching total-pressure and efficiency data from the fan curve, plus motor and drive efficiency.

What this calculator does

  • Calculate fan shaft power at a specified airflow and pressure rise.

Formula used

  • Air horsepower = CFM × Total pressure ÷ 6356
  • Brake horsepower = Air horsepower × 100 ÷ Fan efficiency %
  • Electrical kW = Brake horsepower × 0.745699872 × 100 ÷ Motor and drive efficiency %

Inputs explained

  • Fan Operating Airflow: Actual airflow at the selected fan duty point.
  • Fan Total Pressure Rise: Total pressure rise matching the fan efficiency basis.
  • Fan Total Efficiency: Total efficiency from the fan curve at this duty.
  • Motor and Drive Efficiency: Combined motor and transmission efficiency at operating load.

How to use the result

  • Best suited to fan duty checks, electrical load estimates.
  • This single duty point does not select a motor or predict surge.

Common questions

  • Can I mix static pressure with total efficiency? No. Use pressure and efficiency on the same basis; this tool is labeled for total pressure.
  • Is brake horsepower the motor nameplate rating? No. It is the shaft power absorbed at the entered duty point.
  • Why is electrical input larger than shaft power? The motor and drive consume energy through losses represented by their combined efficiency.
  • Does zero pressure mean the installed fan uses no power? The ideal model returns zero air power. Real idle losses require a measured operating curve.

Last reviewed 2026-10-12.