PLM, BOM & Digital Thread calculator
Document Control Cost Calculator
Find what keeping your controlled documents current costs each year. You need the document count, the upkeep cost per revised document, the share revised in a year and the system fee.
What this calculator does
- Yearly cost of document control from the controlled documents, the upkeep cost of a revision, the share revised and the system fee.
Formula used
- Revision upkeep cost ($) = controlled documents × yearly upkeep cost per revised document × documents revised ÷ 100
- Yearly document control cost ($) = revision upkeep cost + document control system fee
- Cost per controlled document = yearly document control cost ÷ controlled documents
Inputs explained
- Controlled Documents: Documents under revision control.
- Yearly Upkeep Cost per Revised Document: Cost to revise, review and reissue one document in a year.
- Documents Revised per Year: Share of controlled documents revised in the year.
- Document Control System Fee: Yearly fee for the document management system.
How to use the result
- Best suited to budgeting document control for the year, deciding whether to retire old procedures.
- Does not include writing new documents. Ignores training on revised procedures.
Common questions
- What is a controlled document? A procedure, specification or drawing under revision control with an owner, an approval and a distribution list.
- What goes into the upkeep cost? Revising the content, reviewing and approving it, reissuing it and withdrawing the superseded version.
- Why does the share revised matter? Only revised documents cost labor. A set where half the documents change every year costs far more than a stable one of the same size.
- Does the result include new documents? No. Writing and releasing a new document is estimated separately.
Last reviewed 2026-10-28.