Manufacturing Economy Monitor

Textile Mills and Textile Products Manufacturing

Textile Mills and Textile Products manufacturing produced $17.7B of value added in 2025. That is 0.6% of all U.S. manufacturing output and 0.1% of GDP, making it the 18th-largest of the 19 manufacturing subsectors the Bureau of Economic Analysis tracks. Output grew 0.6% year over year. It is classed as nondurable goods manufacturing; the largest producing state is Georgia ($4.5B in 2025).

Output and growth

  • Value added: $17.7B in 2025, 0.6% of all U.S. manufacturing and 0.1% of GDP.
  • Year-over-year change: +0.6% in dollar terms.
  • Classification: nondurable goods manufacturing (BEA subsector 313TT).

Top producing states

  • Georgia: $4.5B (2025)
  • North Carolina: $2.4B (2025)
  • South Carolina: $1.5B (2025)

Frequently asked questions

  • How big is textile mills and textile products manufacturing in the U.S.? Textile Mills and Textile Products manufacturing produced $17.7B of value added in 2025, or 0.6% of all U.S. manufacturing output and 0.1% of total GDP, per BEA GDP-by-industry data. It ranks 18 of 19 manufacturing subsectors by size.
  • Is textile mills and textile products manufacturing growing or shrinking? In the latest annual data (2025), textile mills and textile products value added is up 0.6% year over year in dollar terms. The full quarterly series since 2005 is charted above and updates with each BEA release.
  • Which states produce the most textile mills and textile products? Georgia leads with $4.5B of textile mills and textile products GDP in 2025, followed by North Carolina ($2.4B) and South Carolina ($1.5B), per BEA state GDP data.
  • Is textile mills and textile products a durable or nondurable goods industry? BEA classes textile mills and textile products manufacturing as nondurable goods. Nondurable goods (food, chemicals, plastics, fuel, paper) are products generally consumed within three years.

About this data

  • Source: U.S. Bureau of Economic Analysis (public domain). National quarterly values are seasonally adjusted annual rates. Corporate-profit industry detail reflects inventory valuation adjustment without capital consumption adjustment, per NIPA table 6.16D conventions.

Last reviewed 2026-10-01.