Manufacturing Economy Monitor
Chemical Products Manufacturing
Chemical Products manufacturing produced $579B of value added in 2025. That is 19.8% of all U.S. manufacturing output and 1.9% of GDP, making it the largest of the 19 manufacturing subsectors the Bureau of Economic Analysis tracks. Output grew 5.6% year over year. It is classed as nondurable goods manufacturing; the largest producing state is Texas ($88.6B in 2025).
Output and growth
- Value added: $579B in 2025, 19.8% of all U.S. manufacturing and 1.9% of GDP.
- Year-over-year change: +5.6% in dollar terms.
- Classification: nondurable goods manufacturing (BEA subsector 325).
Top producing states
- Texas: $88.6B (2025)
- California: $77.2B (2025)
- Indiana: $38.7B (2025)
Frequently asked questions
- How big is chemical products manufacturing in the U.S.? Chemical Products manufacturing produced $579B of value added in 2025, or 19.8% of all U.S. manufacturing output and 1.9% of total GDP, per BEA GDP-by-industry data. It ranks 1 of 19 manufacturing subsectors by size.
- Is chemical products manufacturing growing or shrinking? In the latest annual data (2025), chemical products value added is up 5.6% year over year in dollar terms. The full quarterly series since 2005 is charted above and updates with each BEA release.
- Which states produce the most chemical products? Texas leads with $88.6B of chemical products GDP in 2025, followed by California ($77.2B) and Indiana ($38.7B), per BEA state GDP data.
- Is chemical products a durable or nondurable goods industry? BEA classes chemical products manufacturing as nondurable goods. Nondurable goods (food, chemicals, plastics, fuel, paper) are products generally consumed within three years.
About this data
- Source: U.S. Bureau of Economic Analysis (public domain). National quarterly values are seasonally adjusted annual rates. Corporate-profit industry detail reflects inventory valuation adjustment without capital consumption adjustment, per NIPA table 6.16D conventions.
Last reviewed 2026-10-01.