Manufacturing Economy Monitor
Manufacturing in Alabama
Manufacturing contributed $49.5B to Alabama's economy in 2025 (14.6% of the state's GDP), ranking Alabama #21 of 50 states and DC by manufacturing output, per the Bureau of Economic Analysis. Output rose 1.8% year over year (+2.7% after inflation). The state's largest manufacturing industry is motor vehicles and parts ($8.3B in 2025).
Output and rank
- Manufacturing GDP: $49.5B in 2025, #21 of 50 states and DC.
- Share of the state economy: 14.6% of Alabama's GDP.
- Growth: +1.8% year over year (+2.7% after inflation).
- Composition: $34.3B durable goods, $15.3B nondurable goods.
Largest manufacturing industries in Alabama
- Motor Vehicles and Parts: $8.3B (2025)
- Primary Metals: $7.1B (2025)
- Other Transportation Equipment: $4.4B (2025)
Frequently asked questions
- How big is manufacturing in Alabama? Manufacturing contributed $49.5B to Alabama's economy in 2025, ranking #21 of 50 states and DC, per BEA state GDP data.
- What share of Alabama's economy is manufacturing? Manufacturing is 14.6% of Alabama's GDP in 2025. Nationally, manufacturing averages 9.5% of GDP, so Alabama is more manufacturing-intensive than the country as a whole.
- What is the largest manufacturing industry in Alabama? Motor Vehicles and Parts leads at $8.3B (2025), followed by primary metals ($7.1B) and other transportation equipment ($4.4B), per BEA state GDP by industry.
- Is manufacturing in Alabama growing? Alabama's manufacturing GDP is up 1.8% year over year in dollar terms and up 2.7% after inflation, per the latest BEA annual data (2025).
- Does Alabama make more durable or nondurable goods? Durable goods lead in Alabama: $34.3B versus $15.3B of value added in 2025.
About this data
- Source: U.S. Bureau of Economic Analysis (public domain). National quarterly values are seasonally adjusted annual rates. Corporate-profit industry detail reflects inventory valuation adjustment without capital consumption adjustment, per NIPA table 6.16D conventions.
Last reviewed 2026-10-01.