Manufacturing Economy Monitor
Manufacturing in Connecticut
Manufacturing contributed $40.2B to Connecticut's economy in 2025 (10.5% of the state's GDP), ranking Connecticut #26 of 50 states and DC by manufacturing output, per the Bureau of Economic Analysis. Output rose 4.6% year over year (+3.9% after inflation). The state's largest manufacturing industry is other transportation equipment ($16.6B in 2025).
Output and rank
- Manufacturing GDP: $40.2B in 2025, #26 of 50 states and DC.
- Share of the state economy: 10.5% of Connecticut's GDP.
- Growth: +4.6% year over year (+3.9% after inflation).
- Composition: $30.5B durable goods, $9.6B nondurable goods.
Largest manufacturing industries in Connecticut
- Other Transportation Equipment: $16.6B (2025)
- Chemical Products: $5.1B (2025)
- Fabricated Metal Products: $3.9B (2025)
Frequently asked questions
- How big is manufacturing in Connecticut? Manufacturing contributed $40.2B to Connecticut's economy in 2025, ranking #26 of 50 states and DC, per BEA state GDP data.
- What share of Connecticut's economy is manufacturing? Manufacturing is 10.5% of Connecticut's GDP in 2025. Nationally, manufacturing averages 9.5% of GDP, so Connecticut is more manufacturing-intensive than the country as a whole.
- What is the largest manufacturing industry in Connecticut? Other Transportation Equipment leads at $16.6B (2025), followed by chemical products ($5.1B) and fabricated metal products ($3.9B), per BEA state GDP by industry.
- Is manufacturing in Connecticut growing? Connecticut's manufacturing GDP is up 4.6% year over year in dollar terms and up 3.9% after inflation, per the latest BEA annual data (2025).
- Does Connecticut make more durable or nondurable goods? Durable goods lead in Connecticut: $30.5B versus $9.6B of value added in 2025.
About this data
- Source: U.S. Bureau of Economic Analysis (public domain). National quarterly values are seasonally adjusted annual rates. Corporate-profit industry detail reflects inventory valuation adjustment without capital consumption adjustment, per NIPA table 6.16D conventions.
Last reviewed 2026-10-01.