Manufacturing Economy Monitor
Food, Beverage, and Tobacco Products Manufacturing in Connecticut
Food, Beverage, and Tobacco Products manufacturing added $2.2B of value to Connecticut's economy in 2025, down 2.2% year over year. That ranks Connecticut 37th of 50 states and DC for this industry. It is 5.5% of Connecticut's manufacturing output. Nationally, food, beverage, and tobacco products is a $384B industry (the 2nd-largest of the 19 manufacturing subsectors), per the U.S. Bureau of Economic Analysis.
Output and rank
- Value added: $2.2B in 2025, #37 of 50 states and DC for this industry.
- Growth: -2.2% year over year.
- Share of Connecticut's manufacturing: 5.5% of the state's total manufacturing value added.
- National context: food, beverage, and tobacco products is a $384B industry nationally, #2 of the 19 manufacturing subsectors (-1.6% year over year).
- Classification: nondurable goods manufacturing (BEA subsector 311FT).
Frequently asked questions
- How big is the food, beverage, and tobacco products industry in Connecticut? Food, Beverage, and Tobacco Products added $2.2B of value in Connecticut in 2025, ranking the state 37th of 50 states and DC for this industry, per BEA state GDP-by-industry data.
- Is food, beverage, and tobacco products growing in Connecticut? Connecticut's food, beverage, and tobacco products output shrank 2.2% year over year to 2025. The chart above traces the full annual series since 1997.
- What share of Connecticut's manufacturing is food, beverage, and tobacco products? Food, Beverage, and Tobacco Products is 5.5% of Connecticut's total manufacturing value added in 2025, per BEA state GDP-by-industry data.
About this data
- Source: U.S. Bureau of Economic Analysis (public domain). National quarterly values are seasonally adjusted annual rates. Corporate-profit industry detail reflects inventory valuation adjustment without capital consumption adjustment, per NIPA table 6.16D conventions.
Last reviewed 2026-10-01.