Manufacturing Economy Monitor

Fabricated Metal Products Manufacturing in District of Columbia

Fabricated Metal Products manufacturing added $8M of value to District of Columbia's economy in 2025, down 39.8% year over year. That ranks District of Columbia 51st of 50 states and DC for this industry. It is 2.3% of District of Columbia's manufacturing output. Nationally, fabricated metal products is a $199B industry (the 6th-largest of the 19 manufacturing subsectors), per the U.S. Bureau of Economic Analysis.

Output and rank

  • Value added: $8M in 2025, #51 of 50 states and DC for this industry.
  • Growth: -39.8% year over year.
  • Share of District of Columbia's manufacturing: 2.3% of the state's total manufacturing value added.
  • National context: fabricated metal products is a $199B industry nationally, #6 of the 19 manufacturing subsectors (+1.3% year over year).
  • Classification: durable goods manufacturing (BEA subsector 332).

Frequently asked questions

  • How big is the fabricated metal products industry in District of Columbia? Fabricated Metal Products added $8M of value in District of Columbia in 2025, ranking the state 51st of 50 states and DC for this industry, per BEA state GDP-by-industry data.
  • Is fabricated metal products growing in District of Columbia? District of Columbia's fabricated metal products output shrank 39.8% year over year to 2025. The chart above traces the full annual series since 1997.
  • What share of District of Columbia's manufacturing is fabricated metal products? Fabricated Metal Products is 2.3% of District of Columbia's total manufacturing value added in 2025, per BEA state GDP-by-industry data.

About this data

  • Source: U.S. Bureau of Economic Analysis (public domain). National quarterly values are seasonally adjusted annual rates. Corporate-profit industry detail reflects inventory valuation adjustment without capital consumption adjustment, per NIPA table 6.16D conventions.

Last reviewed 2026-10-01.