Manufacturing Economy Monitor

Fabricated Metal Products Manufacturing

Fabricated Metal Products manufacturing produced $199B of value added in 2025. That is 6.8% of all U.S. manufacturing output and 0.6% of GDP, making it the 6th-largest of the 19 manufacturing subsectors the Bureau of Economic Analysis tracks. Output grew 1.3% year over year. It is classed as durable goods manufacturing; the largest producing state is Texas ($20.0B in 2025).

Output and growth

  • Value added: $199B in 2025, 6.8% of all U.S. manufacturing and 0.6% of GDP.
  • Year-over-year change: +1.3% in dollar terms.
  • Classification: durable goods manufacturing (BEA subsector 332).

Top producing states

  • Texas: $20.0B (2025)
  • California: $15.9B (2025)
  • Ohio: $13.9B (2025)

Frequently asked questions

  • How big is fabricated metal products manufacturing in the U.S.? Fabricated Metal Products manufacturing produced $199B of value added in 2025, or 6.8% of all U.S. manufacturing output and 0.6% of total GDP, per BEA GDP-by-industry data. It ranks 6 of 19 manufacturing subsectors by size.
  • Is fabricated metal products manufacturing growing or shrinking? In the latest annual data (2025), fabricated metal products value added is up 1.3% year over year in dollar terms. The full quarterly series since 2005 is charted above and updates with each BEA release.
  • Which states produce the most fabricated metal products? Texas leads with $20.0B of fabricated metal products GDP in 2025, followed by California ($15.9B) and Ohio ($13.9B), per BEA state GDP data.
  • Is fabricated metal products a durable or nondurable goods industry? BEA classes fabricated metal products manufacturing as durable goods. Durable goods (metals, machinery, electronics, vehicles) are products with a service life of three years or more.

About this data

  • Source: U.S. Bureau of Economic Analysis (public domain). National quarterly values are seasonally adjusted annual rates. Corporate-profit industry detail reflects inventory valuation adjustment without capital consumption adjustment, per NIPA table 6.16D conventions.

Last reviewed 2026-10-01.