Manufacturing Economy Monitor
Fabricated Metal Products Manufacturing in Florida
Fabricated Metal Products manufacturing added $6.0B of value to Florida's economy in 2025, down 0.9% year over year. That ranks Florida 11th of 50 states and DC for this industry. It is 6.9% of Florida's manufacturing output. Nationally, fabricated metal products is a $199B industry (the 6th-largest of the 19 manufacturing subsectors), per the U.S. Bureau of Economic Analysis.
Output and rank
- Value added: $6.0B in 2025, #11 of 50 states and DC for this industry.
- Growth: -0.9% year over year.
- Share of Florida's manufacturing: 6.9% of the state's total manufacturing value added.
- National context: fabricated metal products is a $199B industry nationally, #6 of the 19 manufacturing subsectors (+1.3% year over year).
- Classification: durable goods manufacturing (BEA subsector 332).
Frequently asked questions
- How big is the fabricated metal products industry in Florida? Fabricated Metal Products added $6.0B of value in Florida in 2025, ranking the state 11th of 50 states and DC for this industry, per BEA state GDP-by-industry data.
- Is fabricated metal products growing in Florida? Florida's fabricated metal products output shrank 0.9% year over year to 2025. The chart above traces the full annual series since 1997.
- What share of Florida's manufacturing is fabricated metal products? Fabricated Metal Products is 6.9% of Florida's total manufacturing value added in 2025, per BEA state GDP-by-industry data.
About this data
- Source: U.S. Bureau of Economic Analysis (public domain). National quarterly values are seasonally adjusted annual rates. Corporate-profit industry detail reflects inventory valuation adjustment without capital consumption adjustment, per NIPA table 6.16D conventions.
Last reviewed 2026-10-01.