Manufacturing Economy Monitor
Manufacturing in Illinois
Manufacturing contributed $140B to Illinois's economy in 2025 (11.3% of the state's GDP), ranking Illinois #3 of 50 states and DC by manufacturing output, per the Bureau of Economic Analysis. Output rose 0.6% year over year (+0.1% after inflation). The state's largest manufacturing industry is chemical products ($37.5B in 2025).
Output and rank
- Manufacturing GDP: $140B in 2025, #3 of 50 states and DC.
- Share of the state economy: 11.3% of Illinois's GDP.
- Growth: +0.6% year over year (+0.1% after inflation).
- Composition: $64.4B durable goods, $75.9B nondurable goods.
Largest manufacturing industries in Illinois
- Chemical Products: $37.5B (2025)
- Food, Beverage, and Tobacco Products: $18.5B (2025)
- Machinery: $17.6B (2025)
Frequently asked questions
- How big is manufacturing in Illinois? Manufacturing contributed $140B to Illinois's economy in 2025, ranking #3 of 50 states and DC, per BEA state GDP data.
- What share of Illinois's economy is manufacturing? Manufacturing is 11.3% of Illinois's GDP in 2025. Nationally, manufacturing averages 9.5% of GDP, so Illinois is more manufacturing-intensive than the country as a whole.
- What is the largest manufacturing industry in Illinois? Chemical Products leads at $37.5B (2025), followed by food, beverage, and tobacco products ($18.5B) and machinery ($17.6B), per BEA state GDP by industry.
- Is manufacturing in Illinois growing? Illinois's manufacturing GDP is up 0.6% year over year in dollar terms and up 0.1% after inflation, per the latest BEA annual data (2025).
- Does Illinois make more durable or nondurable goods? Nondurable goods lead in Illinois: $75.9B versus $64.4B of value added in 2025.
About this data
- Source: U.S. Bureau of Economic Analysis (public domain). National quarterly values are seasonally adjusted annual rates. Corporate-profit industry detail reflects inventory valuation adjustment without capital consumption adjustment, per NIPA table 6.16D conventions.
Last reviewed 2026-10-01.