Manufacturing Economy Monitor

Manufacturing in Ohio

Manufacturing contributed $133B to Ohio's economy in 2025 (13.6% of the state's GDP), ranking Ohio #4 of 50 states and DC by manufacturing output, per the Bureau of Economic Analysis. Output rose 0.3% year over year (+0.3% after inflation). The state's largest manufacturing industry is chemical products ($24.3B in 2025).

Output and rank

  • Manufacturing GDP: $133B in 2025, #4 of 50 states and DC.
  • Share of the state economy: 13.6% of Ohio's GDP.
  • Growth: +0.3% year over year (+0.3% after inflation).
  • Composition: $74.0B durable goods, $58.8B nondurable goods.

Largest manufacturing industries in Ohio

  • Chemical Products: $24.3B (2025)
  • Food, Beverage, and Tobacco Products: $15.7B (2025)
  • Fabricated Metal Products: $13.9B (2025)

Frequently asked questions

  • How big is manufacturing in Ohio? Manufacturing contributed $133B to Ohio's economy in 2025, ranking #4 of 50 states and DC, per BEA state GDP data.
  • What share of Ohio's economy is manufacturing? Manufacturing is 13.6% of Ohio's GDP in 2025. Nationally, manufacturing averages 9.5% of GDP, so Ohio is more manufacturing-intensive than the country as a whole.
  • What is the largest manufacturing industry in Ohio? Chemical Products leads at $24.3B (2025), followed by food, beverage, and tobacco products ($15.7B) and fabricated metal products ($13.9B), per BEA state GDP by industry.
  • Is manufacturing in Ohio growing? Ohio's manufacturing GDP is up 0.3% year over year in dollar terms and up 0.3% after inflation, per the latest BEA annual data (2025).
  • Does Ohio make more durable or nondurable goods? Durable goods lead in Ohio: $74.0B versus $58.8B of value added in 2025.

About this data

  • Source: U.S. Bureau of Economic Analysis (public domain). National quarterly values are seasonally adjusted annual rates. Corporate-profit industry detail reflects inventory valuation adjustment without capital consumption adjustment, per NIPA table 6.16D conventions.

Last reviewed 2026-09-30.