Manufacturing Economy Monitor

Manufacturing in Louisiana

Manufacturing contributed $62.3B to Louisiana's economy in 2025 (18.2% of the state's GDP), ranking Louisiana #17 of 50 states and DC by manufacturing output, per the Bureau of Economic Analysis. Output rose 0.7% year over year (+1.2% after inflation). The state's largest manufacturing industry is chemical products ($28.7B in 2025).

Output and rank

  • Manufacturing GDP: $62.3B in 2025, #17 of 50 states and DC.
  • Share of the state economy: 18.2% of Louisiana's GDP.
  • Growth: +0.7% year over year (+1.2% after inflation).
  • Composition: $11.1B durable goods, $51.2B nondurable goods.

Largest manufacturing industries in Louisiana

  • Chemical Products: $28.7B (2025)
  • Petroleum and Coal Products: $15.1B (2025)
  • Food, Beverage, and Tobacco Products: $3.1B (2025)

Frequently asked questions

  • How big is manufacturing in Louisiana? Manufacturing contributed $62.3B to Louisiana's economy in 2025, ranking #17 of 50 states and DC, per BEA state GDP data.
  • What share of Louisiana's economy is manufacturing? Manufacturing is 18.2% of Louisiana's GDP in 2025. Nationally, manufacturing averages 9.5% of GDP, so Louisiana is more manufacturing-intensive than the country as a whole.
  • What is the largest manufacturing industry in Louisiana? Chemical Products leads at $28.7B (2025), followed by petroleum and coal products ($15.1B) and food, beverage, and tobacco products ($3.1B), per BEA state GDP by industry.
  • Is manufacturing in Louisiana growing? Louisiana's manufacturing GDP is up 0.7% year over year in dollar terms and up 1.2% after inflation, per the latest BEA annual data (2025).
  • Does Louisiana make more durable or nondurable goods? Nondurable goods lead in Louisiana: $51.2B versus $11.1B of value added in 2025.

About this data

  • Source: U.S. Bureau of Economic Analysis (public domain). National quarterly values are seasonally adjusted annual rates. Corporate-profit industry detail reflects inventory valuation adjustment without capital consumption adjustment, per NIPA table 6.16D conventions.

Last reviewed 2026-10-01.