Manufacturing Economy Monitor
Apparel and Leather Products Manufacturing in Nevada
Apparel and Leather Products manufacturing added $5M of value to Nevada's economy in 2025, up 4.3% year over year. That ranks Nevada 44th of 50 states and DC for this industry. It is 0% of Nevada's manufacturing output. Nationally, apparel and leather products is a $12.2B industry (the 19th-largest of the 19 manufacturing subsectors), per the U.S. Bureau of Economic Analysis.
Output and rank
- Value added: $5M in 2025, #44 of 50 states and DC for this industry.
- Growth: +4.3% year over year.
- Share of Nevada's manufacturing: 0% of the state's total manufacturing value added.
- National context: apparel and leather products is a $12.2B industry nationally, #19 of the 19 manufacturing subsectors (-0.8% year over year).
- Classification: nondurable goods manufacturing (BEA subsector 315AL).
Frequently asked questions
- How big is the apparel and leather products industry in Nevada? Apparel and Leather Products added $5M of value in Nevada in 2025, ranking the state 44th of 50 states and DC for this industry, per BEA state GDP-by-industry data.
- Is apparel and leather products growing in Nevada? Nevada's apparel and leather products output grew 4.3% year over year to 2025. The chart above traces the full annual series since 1997.
- What share of Nevada's manufacturing is apparel and leather products? Apparel and Leather Products is 0% of Nevada's total manufacturing value added in 2025, per BEA state GDP-by-industry data.
About this data
- Source: U.S. Bureau of Economic Analysis (public domain). National quarterly values are seasonally adjusted annual rates. Corporate-profit industry detail reflects inventory valuation adjustment without capital consumption adjustment, per NIPA table 6.16D conventions.
Last reviewed 2026-10-01.