Manufacturing Economy Monitor

Manufacturing in New Hampshire

Manufacturing contributed $12.0B to New Hampshire's economy in 2025 (9.4% of the state's GDP), ranking New Hampshire #38 of 50 states and DC by manufacturing output, per the Bureau of Economic Analysis. Output rose 3.3% year over year (+2.1% after inflation). The state's largest manufacturing industry is computer and electronic products ($3.3B in 2025).

Output and rank

  • Manufacturing GDP: $12.0B in 2025, #38 of 50 states and DC.
  • Share of the state economy: 9.4% of New Hampshire's GDP.
  • Growth: +3.3% year over year (+2.1% after inflation).
  • Composition: $9.1B durable goods, $2.9B nondurable goods.

Largest manufacturing industries in New Hampshire

  • Computer and Electronic Products: $3.3B (2025)
  • Fabricated Metal Products: $1.7B (2025)
  • Machinery: $1.3B (2025)

Frequently asked questions

  • How big is manufacturing in New Hampshire? Manufacturing contributed $12.0B to New Hampshire's economy in 2025, ranking #38 of 50 states and DC, per BEA state GDP data.
  • What share of New Hampshire's economy is manufacturing? Manufacturing is 9.4% of New Hampshire's GDP in 2025. Nationally, manufacturing averages 9.5% of GDP, so New Hampshire is less manufacturing-intensive than the national average.
  • What is the largest manufacturing industry in New Hampshire? Computer and Electronic Products leads at $3.3B (2025), followed by fabricated metal products ($1.7B) and machinery ($1.3B), per BEA state GDP by industry.
  • Is manufacturing in New Hampshire growing? New Hampshire's manufacturing GDP is up 3.3% year over year in dollar terms and up 2.1% after inflation, per the latest BEA annual data (2025).
  • Does New Hampshire make more durable or nondurable goods? Durable goods lead in New Hampshire: $9.1B versus $2.9B of value added in 2025.

About this data

  • Source: U.S. Bureau of Economic Analysis (public domain). National quarterly values are seasonally adjusted annual rates. Corporate-profit industry detail reflects inventory valuation adjustment without capital consumption adjustment, per NIPA table 6.16D conventions.

Last reviewed 2026-10-01.