Manufacturing Economy Monitor
Nonmetallic Mineral Products Manufacturing in New Mexico
Nonmetallic Mineral Products manufacturing added $280M of value to New Mexico's economy in 2025, down 7.3% year over year. That ranks New Mexico 42nd of 50 states and DC for this industry. It is 6.3% of New Mexico's manufacturing output. Nationally, nonmetallic mineral products is a $85.1B industry (the 12th-largest of the 19 manufacturing subsectors), per the U.S. Bureau of Economic Analysis.
Output and rank
- Value added: $280M in 2025, #42 of 50 states and DC for this industry.
- Growth: -7.3% year over year.
- Share of New Mexico's manufacturing: 6.3% of the state's total manufacturing value added.
- National context: nonmetallic mineral products is a $85.1B industry nationally, #12 of the 19 manufacturing subsectors (+0.4% year over year).
- Classification: durable goods manufacturing (BEA subsector 327).
Frequently asked questions
- How big is the nonmetallic mineral products industry in New Mexico? Nonmetallic Mineral Products added $280M of value in New Mexico in 2025, ranking the state 42nd of 50 states and DC for this industry, per BEA state GDP-by-industry data.
- Is nonmetallic mineral products growing in New Mexico? New Mexico's nonmetallic mineral products output shrank 7.3% year over year to 2025. The chart above traces the full annual series since 1997.
- What share of New Mexico's manufacturing is nonmetallic mineral products? Nonmetallic Mineral Products is 6.3% of New Mexico's total manufacturing value added in 2025, per BEA state GDP-by-industry data.
About this data
- Source: U.S. Bureau of Economic Analysis (public domain). National quarterly values are seasonally adjusted annual rates. Corporate-profit industry detail reflects inventory valuation adjustment without capital consumption adjustment, per NIPA table 6.16D conventions.
Last reviewed 2026-10-01.