Manufacturing Economy Monitor
Nonmetallic Mineral Products Manufacturing
Nonmetallic Mineral Products manufacturing produced $85.1B of value added in 2025. That is 2.9% of all U.S. manufacturing output and 0.3% of GDP, making it the 12th-largest of the 19 manufacturing subsectors the Bureau of Economic Analysis tracks. Output grew 0.4% year over year. It is classed as durable goods manufacturing; the largest producing state is Texas ($8.6B in 2025).
Output and growth
- Value added: $85.1B in 2025, 2.9% of all U.S. manufacturing and 0.3% of GDP.
- Year-over-year change: +0.4% in dollar terms.
- Classification: durable goods manufacturing (BEA subsector 327).
Top producing states
- Texas: $8.6B (2025)
- California: $5.9B (2025)
- Ohio: $5.0B (2025)
Frequently asked questions
- How big is nonmetallic mineral products manufacturing in the U.S.? Nonmetallic Mineral Products manufacturing produced $85.1B of value added in 2025, or 2.9% of all U.S. manufacturing output and 0.3% of total GDP, per BEA GDP-by-industry data. It ranks 12 of 19 manufacturing subsectors by size.
- Is nonmetallic mineral products manufacturing growing or shrinking? In the latest annual data (2025), nonmetallic mineral products value added is up 0.4% year over year in dollar terms. The full quarterly series since 2005 is charted above and updates with each BEA release.
- Which states produce the most nonmetallic mineral products? Texas leads with $8.6B of nonmetallic mineral products GDP in 2025, followed by California ($5.9B) and Ohio ($5.0B), per BEA state GDP data.
- Is nonmetallic mineral products a durable or nondurable goods industry? BEA classes nonmetallic mineral products manufacturing as durable goods. Durable goods (metals, machinery, electronics, vehicles) are products with a service life of three years or more.
About this data
- Source: U.S. Bureau of Economic Analysis (public domain). National quarterly values are seasonally adjusted annual rates. Corporate-profit industry detail reflects inventory valuation adjustment without capital consumption adjustment, per NIPA table 6.16D conventions.
Last reviewed 2026-10-01.