Manufacturing Economy Monitor
Chemical Products Manufacturing in Washington
Chemical Products manufacturing added $3.9B of value to Washington's economy in 2025, up 4.7% year over year. That ranks Washington 28th of 50 states and DC for this industry. It is 6.3% of Washington's manufacturing output. Nationally, chemical products is a $579B industry (the largest of the 19 manufacturing subsectors), per the U.S. Bureau of Economic Analysis.
Output and rank
- Value added: $3.9B in 2025, #28 of 50 states and DC for this industry.
- Growth: +4.7% year over year.
- Share of Washington's manufacturing: 6.3% of the state's total manufacturing value added.
- National context: chemical products is a $579B industry nationally, #1 of the 19 manufacturing subsectors (+5.6% year over year).
- Classification: nondurable goods manufacturing (BEA subsector 325).
Frequently asked questions
- How big is the chemical products industry in Washington? Chemical Products added $3.9B of value in Washington in 2025, ranking the state 28th of 50 states and DC for this industry, per BEA state GDP-by-industry data.
- Is chemical products growing in Washington? Washington's chemical products output grew 4.7% year over year to 2025. The chart above traces the full annual series since 1997.
- What share of Washington's manufacturing is chemical products? Chemical Products is 6.3% of Washington's total manufacturing value added in 2025, per BEA state GDP-by-industry data.
About this data
- Source: U.S. Bureau of Economic Analysis (public domain). National quarterly values are seasonally adjusted annual rates. Corporate-profit industry detail reflects inventory valuation adjustment without capital consumption adjustment, per NIPA table 6.16D conventions.
Last reviewed 2026-10-01.