HTS Heading 0105
Live poultry of the following kinds: Chickens, ducks, geese, turkeys and guineas
All 9 HTS codes under heading 0105 (live poultry of the following kinds), with their duty rates from the 2026 HTS Revision 23. General duty Free, some per unit.
Every line of heading 0105
- 0105 Live poultry of the following kinds: Chickens, ducks, geese, turkeys and guineas.
- 0105.11.00 Chickens (under: Weighing not more than 185 g): General 0.9¢ each; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 4¢ each.
- 0105.11.00.10 Layer-type (egg-type) (under: Breeding stock, whether or not purebred) (No.).
- 0105.11.00.20 Broiler-type (meat-type) (under: Breeding stock, whether or not purebred) (No.).
- 0105.11.00.40 Other (under: Chickens) (No.).
- 0105.12.00.00 Turkeys (under: Weighing not more than 185 g) (No.): General 0.9¢ each; Special Free (A+,AU,BH, CL,CO,D,E, IL,JO,KR,MA,OM,P,PA, PE,S,SG); Column 2 4¢ each.
- 0105.13.00.00 Ducks (under: Weighing not more than 185 g) (No.): General 0.9¢ each; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA,PE,S, SG); Column 2 4¢ each.
- 0105.14.00.00 Geese (under: Weighing not more than 185 g) (No.): General 0.9¢ each; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 4¢ each.
- 0105.15.00.00 Guinea fowls (under: Weighing not more than 185 g) (No.): General 0.9¢ each; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 4¢ each.
- 0105.94.00.00 Chickens (under: Other) (No., kg): General 2¢/kg; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 17.6¢/kg.
- 0105.99.00.00 Other (under: Other) (No., kg): General 2¢/kg; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 17.6¢/kg.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.