HTS Heading 0106
Other live animals
All 18 HTS codes under heading 0106 (other live animals), with their duty rates from the 2026 HTS Revision 23. General duty Free to 4.8%.
Every line of heading 0106
- 0106 Other live animals.
- 0106.11.00.00 Primates (under: Mammals) (No.): General Free; Special none; Column 2 15%.
- 0106.12.01.00 Whales, dolphins and porpoises (mammals of the order Cetacea); manatees and dugongs (mammals of the order Sirenia); seals, sea lions and walruses (mammals of the suborder Pinnipedia) (No.): General Free; Special none; Column 2 15%.
- 0106.13.00.00 Camels and other camelids (Camelidae) (No.): General Free; Special none; Column 2 15%.
- 0106.14.00.00 Rabbits and hares (under: Mammals) (No.): General Free; Special none; Column 2 15%.
- 0106.19 Other (under: Mammals).
- 0106.19.30.00 Foxes (under: Other) (No.): General 4.8%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 15%.
- 0106.19.91 Other (under: Other): General Free; Special none; Column 2 15%.
- 0106.19.91.20 Dogs (under: Other) (No.).
- 0106.19.91.95 Other (under: Other) (No.).
- 0106.20.00.00 Reptiles (including snakes and turtles) (No.): General Free; Special none; Column 2 15%.
- 0106.31.00.00 Birds of prey (under: Birds) (No.): General 1.8%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 20%.
- 0106.32.00.00 Psittaciformes (including parrots, parakeets, macaws and cockatoos) (No.): General 1.8%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 20%.
- 0106.33.00.00 Ostriches; emus (Dromaius novaehollandiae) (No.): General 1.8%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 20%.
- 0106.39.01.00 Other (under: Birds) (No.): General 1.8%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 20%.
- 0106.41.00.00 Bees (under: Insects) (kg): General Free; Special none; Column 2 15%.
- 0106.49.00 Other (under: Insects): General Free; Special none; Column 2 15%.
- 0106.49.00.10 Leaf cutter bee larvae (under: Other) (kg).
- 0106.49.00.90 Other (under: Other) (kg).
- 0106.90.01 Other (under: Other live animals): General Free; Special none; Column 2 15%.
- 0106.90.01.10 Worms (under: Other) (kg).
- 0106.90.01.20 Bait (other than worms) (under: Other) (kg).
- 0106.90.01.80 Other (under: Other) (kg).
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.