HTS Heading 0409
Natural honey
All 6 HTS codes under heading 0409 (natural honey), with their duty rates from the 2026 HTS Revision 23. General duty Free, some per unit.
Every line of heading 0409
- 0409.00.00 Natural honey: General 1.9¢/kg; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA,PE,S, SG); Column 2 6.6¢/kg.
- 0409.00.00.05 Certified Organic (under: Natural honey) (kg).
- 0409.00.00.10 Comb honey and honey packaged for retail sale (kg).
- 0409.00.00.35 White or lighter (under: Other) (kg).
- 0409.00.00.45 Extra light amber (under: Other) (kg).
- 0409.00.00.56 Light amber (under: Other) (kg).
- 0409.00.00.65 Amber or darker (under: Other) (kg).
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.