HTS Heading 0410
Insects and other edible products of animal origin, not elsewhere specified or included
All 2 HTS codes under heading 0410 (insects and other edible products of animal origin), with their duty rates from the 2026 HTS Revision 23. General duty 1.1%.
Every line of heading 0410
- 0410 Insects and other edible products of animal origin, not elsewhere specified or included.
- 0410.10.00.00 Insects (under: Insects and other edible products of animal origin, not elsewhere specified or included) (kg): General 1.1%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 10%.
- 0410.90.00.00 Other (under: Insects and other edible products of animal origin, not elsewhere specified or included) (kg): General 1.1%; Special Free (A,AU, BH,CL,CO,D, E,IL,JO,KR, MA,OM,P,PA, PE,S,SG); Column 2 10%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.