HTS Heading 0501
Human hair, unworked, whether or not washed or scoured; waste of human hair
The HTS code under heading 0501 (human hair, unworked, whether or not washed or scoured), with its duty rates from the 2026 HTS Revision 23. General duty 1.4%.
Every line of heading 0501
- 0501.00.00.00 Human hair, unworked, whether or not washed or scoured; waste of human hair (kg): General 1.4%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 20%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.