HTS Heading 0502

Pigs', hogs' or boars' bristles and hair; badger hair and other brushmaking hair; waste of such bristles or hair

All 2 HTS codes under heading 0502 (pigs'), with their duty rates from the 2026 HTS Revision 23. General duty Free, some per unit.

Every line of heading 0502

  • 0502 Pigs', hogs' or boars' bristles and hair; badger hair and other brushmaking hair; waste of such bristles or hair.
  • 0502.10.00.00 Pigs', hogs' or boars' bristles and hair and waste thereof (kg): General 0.8¢/kg; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 6.6¢/kg.
  • 0502.90.00.00 Other (under: Pigs', hogs' or boars' bristles and hair; badger hair and other brushmaking hair; waste of such bristles or hair) (kg): General Free; Special none; Column 2 Free.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.