HTS Heading 0504
Guts, bladders and stomachs of animals (other than fish), whole and pieces thereof, fresh, chilled, frozen, salted, in brine, dried or smoked
All 3 HTS codes under heading 0504 (guts), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 0504
- 0504.00.00 Guts, bladders and stomachs of animals (other than fish), whole and pieces thereof, fresh, chilled, frozen, salted, in brine, dried or smoked: General Free; Special none; Column 2 Free.
- 0504.00.00.20 Hog (under: Prepared for use as sausage casings) (kg).
- 0504.00.00.40 Other (under: Prepared for use as sausage casings) (kg).
- 0504.00.00.60 Other (under: Guts, bladders and stomachs of animals (other than fish), whole and pieces thereof, fresh, chilled, frozen, salted, in brine, dried or smoked) (kg).
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.