HTS Heading 0505
Skins and other parts of birds, with their feathers or down, feathers and parts of feathers (whether or not with trimmed edges) and down, not further worked than cleaned, disinfected or treated for preservation; powder and waste of feathers or parts of feathers
All 7 HTS codes under heading 0505 (skins and other parts of birds), with their duty rates from the 2026 HTS Revision 23. General duty Free to 2.3%.
Every line of heading 0505
- 0505 Skins and other parts of birds, with their feathers or down, feathers and parts of feathers (whether or not with trimmed edges) and down, not further worked than cleaned, disinfected or treated for preservation; powder and waste of feathers or parts of feathers.
- 0505.10.00 Feathers of a kind used for stuffing; down: General Free; Special none; Column 2 20%.
- 0505.10.00.50 Feathers (under: Meeting with ASTM D4522, Section 2.2 IDFB Testing Regulations, Part 2, Sections 2.2, 2.3, Part 7 and Part 11-B) (kg).
- 0505.10.00.55 Down (under: Meeting with ASTM D4522, Section 2.2 IDFB Testing Regulations, Part 2, Sections 2.2, 2.3, Part 7 and Part 11-B) (kg).
- 0505.10.00.60 Feathers (under: Other) (kg).
- 0505.10.00.65 Down (under: Other) (kg).
- 0505.90 Other (under: Skins and other parts of birds, with their feathers or down, feathers and parts of feathers (whether or not with trimmed edges) and down, not further worked than cleaned, disinfected or treated for preservation; powder and waste of feathers or parts of feathers).
- 0505.90.20 Feather meal and waste (under: Other): General 2.3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 20%.
- 0505.90.20.20 Feather meal (under: Feather meal and waste) (kg).
- 0505.90.20.40 Other (under: Feather meal and waste) (kg).
- 0505.90.60.00 Other (under: Other) (kg): General Free; Special none; Column 2 20%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.