HTS Heading 0803

Bananas and plantains, fresh or dried

All 5 HTS codes under heading 0803 (bananas and plantains, fresh or dried), with their duty rates from the 2026 HTS Revision 23. General duty Free to 1.4%.

Every line of heading 0803

  • 0803 Bananas and plantains, fresh or dried.
  • 0803.10 Plantains (under: Bananas and plantains, fresh or dried).
  • 0803.10.10.00 Fresh (under: Plantains) (kg): General Free; Special none; Column 2 Free.
  • 0803.10.20.00 Dried (under: Plantains) (kg): General 1.4%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 0803.90.00 Other (under: Bananas and plantains, fresh or dried): General Free; Special none; Column 2 Free.
  • 0803.90.00.25 Certified organic (under: Other) (kg).
  • 0803.90.00.35 Fresh (under: Other) (kg).
  • 0803.90.00.45 Dried (under: Other) (kg).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.