HTS Heading 1302

Vegetable saps and extracts; pectic substances, pectinates and pectates; agar-agar and other mucilages and thickeners, whether or not modified, derived from vegetable products

All 16 HTS codes under heading 1302 (vegetable saps), with their duty rates from the 2026 HTS Revision 23. General duty Free to 3.8%, some per unit.

Every line of heading 1302

  • 1302 Vegetable saps and extracts; pectic substances, pectinates and pectates; agar-agar and other mucilages and thickeners, whether or not modified, derived from vegetable products.
  • 1302.11.00.00 Opium (under: Vegetable saps and extracts) (kg amc): General Free; Special none; Column 2 $40/kg of anhydrous morphine content.
  • 1302.12.00.00 Of licorice (under: Vegetable saps and extracts) (kg): General 3.8%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 20%.
  • 1302.13.00.00 Of hops (under: Vegetable saps and extracts) (kg): General 89¢/kg; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA,PE,S, SG); Column 2 $5.29/kg.
  • 1302.14.01.00 Of ephedra (under: Vegetable saps and extracts) (kg): General 1%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 10%.
  • 1302.19 Other (under: Vegetable saps and extracts).
  • 1302.19.21.00 Poppy straw extract (under: Ginseng; substances having anesthetic, prophylactic or therapeutic properties) (kg): General Free; Special none; Column 2 Free.
  • 1302.19.41 Other (under: Ginseng; substances having anesthetic, prophylactic or therapeutic properties): General 1%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 10%.
  • 1302.19.41.20 Ginseng (under: Other) (kg).
  • 1302.19.41.40 Other (under: Other) (kg).
  • 1302.19.91 Other (under: Other): General Free; Special none; Column 2 Free.
  • 1302.19.91.20 Cashew nut shell liquid (under: Other) (kg).
  • 1302.19.91.45 Certified organic (under: Other) (kg).
  • 1302.19.91.55 Other (under: Other) (kg).
  • 1302.20.00.00 Pectic substances, pectinates and pectates (kg): General Free; Special none; Column 2 25%.
  • 1302.31.00.00 Agar-agar (under: Mucilages and thickeners, whether or not modified, derived from vegetable products) (kg): General Free; Special none; Column 2 25%.
  • 1302.32.00 Mucilages and thickeners, whether or not modified, derived from locust beans, locust bean seeds or guar seeds: General Free; Special none; Column 2 Free.
  • 1302.32.00.20 Guar (under: Mucilages and thickeners, whether or not modified, derived from locust beans, locust bean seeds or guar seeds) (kg).
  • 1302.32.00.40 Locust bean (under: Mucilages and thickeners, whether or not modified, derived from locust beans, locust bean seeds or guar seeds) (kg).
  • 1302.39.00 Other (under: Mucilages and thickeners, whether or not modified, derived from vegetable products): General 3.2%; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA,PE,S, SG); Column 2 20%.
  • 1302.39.00.10 Carrageenan (under: Other) (kg).
  • 1302.39.00.90 Other (under: Other) (kg).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.