HTS Heading 1401
Vegetable materials of a kind used primarily for plaiting (for example, bamboos, rattans, reeds, rushes, osier, raffia, cleaned, bleached or dyed cereal straw, and lime bark)
All 6 HTS codes under heading 1401 (vegetable materials), with their duty rates from the 2026 HTS Revision 23. General duty Free to 4.4%.
Every line of heading 1401
- 1401 Vegetable materials of a kind used primarily for plaiting (for example, bamboos, rattans, reeds, rushes, osier, raffia, cleaned, bleached or dyed cereal straw, and lime bark).
- 1401.10.00.00 Bamboos (under: Vegetable materials of a kind used primarily for plaiting (for example, bamboos, rattans, reeds, rushes, osier, raffia, cleaned, bleached or dyed cereal straw, and lime bark)) (No.): General Free; Special none; Column 2 Free.
- 1401.20 Rattans (under: Vegetable materials of a kind used primarily for plaiting (for example, bamboos, rattans, reeds, rushes, osier, raffia, cleaned, bleached or dyed cereal straw, and lime bark)).
- 1401.20.20 In the rough or cut transversely into sections: General Free; Special none; Column 2 Free.
- 1401.20.20.10 In the rough, 4 meters or more in length (No.).
- 1401.20.20.90 Other (under: In the rough or cut transversely into sections) (No.).
- 1401.20.40.00 Other (under: Rattans) (No.): General 2%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 20%.
- 1401.90 Other (under: Vegetable materials of a kind used primarily for plaiting (for example, bamboos, rattans, reeds, rushes, osier, raffia, cleaned, bleached or dyed cereal straw, and lime bark)).
- 1401.90.20.00 Willow (osier) (under: Other) (kg): General 4.4%; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA,PE,S, SG); Column 2 35%.
- 1401.90.40.00 Other (under: Other) (kg): General 3.2%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 20%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.