HTS Chapter 14

Vegetable plaiting materials; vegetable products not elsewhere specified

The 2 headings and 14 HTS codes of chapter 14 (vegetable plaiting materials), with their duty rates from the 2026 HTS Revision 23.

The 2 headings of chapter 14

Where it sits in the schedule

Chapter 14 is in Section II of the Harmonized System, vegetable products (chapters 6 to 14). Rates are those printed in the 2026 HTS Revision 23; Chapter 99 duties (Section 232, Section 301, IEEPA) are charged on top and are not included.

Last reviewed 2026-11-12.