HTS Chapter 33

Essential oils and resinoids; perfumery, cosmetic or toilet preparations

The 7 headings and 74 HTS codes of chapter 33 (essential oils and resinoids), with their duty rates from the 2026 HTS Revision 23.

The 7 headings of chapter 33

Where it sits in the schedule

Chapter 33 is in Section VI of the Harmonized System, chemical products (chapters 28 to 38). Rates are those printed in the 2026 HTS Revision 23; Chapter 99 duties (Section 232, Section 301, IEEPA) are charged on top and are not included.

Last reviewed 2026-11-12.