HTS Heading 3302

Mixtures of odoriferous substances and mixtures (including alcoholic solutions) with a basis of one or more of these substances, of a kind used as raw materials in industry; other preparations based on odoriferous substances, of a kind used for the manufacture of beverages

All 9 HTS codes under heading 3302 (mixtures of odoriferous), with their duty rates from the 2026 HTS Revision 23. General duty Free to 1.9%, some per unit.

Every line of heading 3302

  • 3302 Mixtures of odoriferous substances and mixtures (including alcoholic solutions) with a basis of one or more of these substances, of a kind used as raw materials in industry; other preparations based on odoriferous substances, of a kind used for the manufacture of beverages.
  • 3302.10 Of a kind used in the food or drink industries.
  • 3302.10.10.00 Not containing alcohol (under: Of a kind used in the food or drink industries) (kg): General Free; Special none; Column 2 25%.
  • 3302.10.20.00 Containing not over 20 percent of alcohol by weight (kg): General Free; Special none; Column 2 44¢/kg + 25%.
  • 3302.10.40.00 Containing over 20 percent but not over 50 percent of alcohol by weight (kg): General 8.4¢/kg + 1.9%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 88¢/kg +25%.
  • 3302.10.50.00 Containing over 50 percent of alcohol by weight (kg): General 17¢/kg + 1.9%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 $1.76/kg + 25%.
  • 3302.10.90.00 Other (under: Containing over 20 percent of alcohol by weight) (kg): General Free; Special none; Column 2 50%.
  • 3302.90 Other (under: Mixtures of odoriferous substances and mixtures (including alcoholic solutions) with a basis of one or more of these substances, of a kind used as raw materials in industry; other preparations based on odoriferous substances, of a kind used for the manufacture of beverages).
  • 3302.90.10 Containing no alcohol or not over 10 percent of alcohol by weight: General Free; Special none; Column 2 88¢/kg + 50%.
  • 3302.90.10.10 Perfume oil mixtures and blends, consisting of products ready for use as finished perfume bases (kg).
  • 3302.90.10.50 Other (under: Containing no alcohol or not over 10 percent of alcohol by weight) (kg).
  • 3302.90.20 Containing over 10 percent of alcohol by weight: General Free; Special none; Column 2 88¢/kg + 75%.
  • 3302.90.20.10 Perfume oil mixtures and blends, consisting of products ready for use as finished perfume bases (kg).
  • 3302.90.20.50 Other (under: Containing over 10 percent of alcohol by weight) (kg).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.