HTS Heading 3303
Perfumes and toilet waters
All 3 HTS codes under heading 3303 (perfumes and toilet waters), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 3303
- 3303.00 Perfumes and toilet waters.
- 3303.00.10.00 Floral or flower waters (under: Not containing alcohol) (liters): General Free; Special none; Column 2 20%.
- 3303.00.20.00 Other (under: Not containing alcohol) (kg): General Free; Special none; Column 2 75%.
- 3303.00.30.00 Containing alcohol (under: Perfumes and toilet waters) (kg): General Free; Special none; Column 2 88¢/kg + 75%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.