HTS Heading 3304
Beauty or make-up preparations and preparations for the care of the skin (other than medicaments), including sunscreen or sun tan preparations; manicure or pedicure preparations
All 7 HTS codes under heading 3304 (beauty or make-up preparations and preparations), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 3304
- 3304 Beauty or make-up preparations and preparations for the care of the skin (other than medicaments), including sunscreen or sun tan preparations; manicure or pedicure preparations.
- 3304.10.00.00 Lip make-up preparations (under: Beauty or make-up preparations and preparations for the care of the skin (other than medicaments), including sunscreen or sun tan preparations; manicure or pedicure preparations) (kg): General Free; Special none; Column 2 75%.
- 3304.20.00.00 Eye make-up preparations (under: Beauty or make-up preparations and preparations for the care of the skin (other than medicaments), including sunscreen or sun tan preparations; manicure or pedicure preparations) (kg): General Free; Special none; Column 2 75%.
- 3304.30.00.00 Manicure or pedicure preparations (kg): General Free; Special none; Column 2 75%.
- 3304.91.00 Powders, whether or not compressed: General Free; Special none; Column 2 75%.
- 3304.91.00.10 Rouges (under: Powders, whether or not compressed) (kg).
- 3304.91.00.50 Other (under: Powders, whether or not compressed) (kg).
- 3304.99.10.00 Petroleum jelly put up for retail sale (kg): General Free; Special none; Column 2 75%.
- 3304.99.50.00 Other (under: Other) (kg): General Free; Special none; Column 2 75%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.