HTS Heading 3305

Preparations for use on the hair

All 4 HTS codes under heading 3305 (preparations for use on the hair), with their duty rates from the 2026 HTS Revision 23. General duty Free.

Every line of heading 3305

  • 3305 Preparations for use on the hair.
  • 3305.10.00.00 Shampoos (under: Preparations for use on the hair) (kg): General Free; Special none; Column 2 75%.
  • 3305.20.00.00 Preparations for permanent waving or straightening (kg): General Free; Special none; Column 2 75%.
  • 3305.30.00.00 Hair lacquers (under: Preparations for use on the hair) (kg): General Free; Special none; Column 2 88¢/kg + 75%.
  • 3305.90.00.00 Other (under: Preparations for use on the hair) (kg): General Free; Special none; Column 2 88¢/kg + 75%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.