HTS Heading 3306

Preparations for oral or dental hygiene, including denture fixative pastes and powders; yarn used to clean between the teeth (dental floss), in individual retail packages

All 3 HTS codes under heading 3306 (preparations for oral or dental hygiene), with their duty rates from the 2026 HTS Revision 23. General duty Free.

Every line of heading 3306

  • 3306 Preparations for oral or dental hygiene, including denture fixative pastes and powders; yarn used to clean between the teeth (dental floss), in individual retail packages.
  • 3306.10.00.00 Dentifrices (under: Preparations for oral or dental hygiene, including denture fixative pastes and powders; yarn used to clean between the teeth (dental floss), in individual retail packages) (kg): General Free; Special none; Column 2 75%.
  • 3306.20.00.00 Yarn used to clean between the teeth (dental floss) (kg): General Free; Special none; Column 2 88¢/kg + 75%.
  • 3306.90.00.00 Other (under: Preparations for oral or dental hygiene, including denture fixative pastes and powders; yarn used to clean between the teeth (dental floss), in individual retail packages) (kg): General Free; Special none; Column 2 88¢/kg + 75%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.