HTS Heading 3919
Self-adhesive plates, sheets, film, foil, tape, strip and other flat shapes, of plastics, whether or not in rolls
All 13 HTS codes under heading 3919 (self-adhesive plates, sheets, film, foil), with their duty rates from the 2026 HTS Revision 23. General duty 5.8% to 6.5%.
Every line of heading 3919
- 3919 Self-adhesive plates, sheets, film, foil, tape, strip and other flat shapes, of plastics, whether or not in rolls.
- 3919.10 In rolls of a width not exceeding 20 cm.
- 3919.10.10 Having a light-reflecting surface produced in whole or in part by glass grains (ballotini): General 6.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 50%.
- 3919.10.10.10 Pavement marking tape (under: Having a light-reflecting surface produced in whole or in part by glass grains (ballotini)) (m2, kg).
- 3919.10.10.50 Other (under: Having a light-reflecting surface produced in whole or in part by glass grains (ballotini)) (kg).
- 3919.10.20 Other (under: In rolls of a width not exceeding 20 cm): General 5.8%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
- 3919.10.20.10 Filament reinforced tape (under: Other) (m2, kg).
- 3919.10.20.20 Electrical tape (under: Other) (m2, kg).
- 3919.10.20.30 Not exceeding 5 cm in width (under: Transparent tape, not exceeding 55 m in length) (m2, kg).
- 3919.10.20.40 Other (under: Transparent tape, not exceeding 55 m in length) (m2, kg).
- 3919.10.20.55 Other (under: Other) (m2, kg).
- 3919.90 Other (under: Self-adhesive plates, sheets, film, foil, tape, strip and other flat shapes, of plastics, whether or not in rolls).
- 3919.90.10.00 Having a light-reflecting surface produced in whole or in part by glass grains (ballotini) (kg): General 6.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 50%.
- 3919.90.50 Other (under: Other): General 5.8%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
- 3919.90.50.10 Reflectorized sheeting (under: Other) (m2, kg).
- 3919.90.50.20 Filament reinforced tape (under: Other) (m2, kg).
- 3919.90.50.30 Electrical tape (under: Other) (m2, kg).
- 3919.90.50.40 Transparent tape (under: Other) (m2, kg).
- 3919.90.50.60 Other (under: Other) (m2, kg).
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.