HTS Heading 4403
Wood in the rough, whether or not stripped of bark or sap- wood, or roughly squared
All 85 HTS codes under heading 4403 (wood in the rough), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 4403
- 4403 Wood in the rough, whether or not stripped of bark or sap- wood, or roughly squared.
- 4403.11.00 Coniferous (under: Treated with paint, stain, creosote or other preservatives): General Free; Special none; Column 2 Free.
- 4403.11.00.20 Telephone, telegraph and electrical power poles (m).
- 4403.11.00.40 Fence posts (under: Poles, piles and posts) (m).
- 4403.11.00.50 Other (under: Poles, piles and posts) (m).
- 4403.11.00.60 Other (under: Coniferous) (m3).
- 4403.12.00 Nonconiferous (under: Treated with paint, stain, creosote or other preservatives): General Free; Special none; Column 2 Free.
- 4403.12.00.20 Telephone, telegraph and electrical power poles (m).
- 4403.12.00.40 Fence posts (under: Poles, piles and posts) (m).
- 4403.12.00.50 Other (under: Poles, piles and posts) (m).
- 4403.12.00.60 Other (under: Nonconiferous) (m3).
- 4403.21.01 Of pine (Pinus spp.), of which the smallest cross-sectional dimension is 15 cm or more: General Free; Special none; Column 2 Free.
- 4403.21.01.12 Telephone, telegraph and electrical power poles (m).
- 4403.21.01.15 Fence posts (under: Poles, piles and posts) (m).
- 4403.21.01.16 Other (under: Poles, piles and posts) (m).
- 4403.21.01.20 Southern yellow pine (Loblolly pine (Pinus taeda)), long leaf pine (Pinus palustris), pitch pine (Pinus rigida), short leaf pine (Pinus echinata), slash pine (Pinus elliottii) and Virginia pine (Pinus virginiana) (m3).
- 4403.21.01.25 Ponderosa pine (Pinus ponderosa) (m3).
- 4403.21.01.30 Other (under: Logs and timber) (m3).
- 4403.21.01.65 Other (under: Of pine (Pinus spp.), of which the smallest cross-sectional dimension is 15 cm or more) (m3).
- 4403.22.01 Of pine (Pinus spp.), other (under: Other, coniferous): General Free; Special none; Column 2 Free.
- 4403.22.01.08 Pulpwood (under: Of pine (Pinus spp.), other) (m3).
- 4403.22.01.12 Telephone, telegraph and electrical power poles (m).
- 4403.22.01.15 Fence posts (under: Poles, piles and posts) (m).
- 4403.22.01.16 Other (under: Poles, piles and posts) (m).
- 4403.22.01.20 Southern yellow pine (Loblolly pine (Pinus taeda)), long leaf pine (Pinus palustris), pitch pine (Pinus rigida), short leaf pine (Pinus echinata), slash pine (Pinus elliottii) and Virginia pine (Pinus virginiana) (m3).
- 4403.22.01.25 Ponderosa pine (Pinus ponderosa) (m3).
- 4403.22.01.30 Other (under: Logs and timber) (m3).
- 4403.22.01.65 Other (under: Of pine (Pinus spp.), other) (m3).
- 4403.23.01 Of fir (Abies spp.) and spruce (Picea spp.), of which the smallest cross-sectional dimension is 15 cm or more: General Free; Special none; Column 2 Free.
- 4403.23.01.12 Telephone, telegraph and electrical power poles (m).
- 4403.23.01.15 Fence posts (under: Poles, piles and posts) (m).
- 4403.23.01.16 Other (under: Poles, piles and posts) (m).
- 4403.23.01.35 Spruce (Picea spp.) (under: Logs and timber) (m3).
- 4403.23.01.42 Other fir; balsam (under: Logs and timber) (m3).
- 4403.23.01.65 Other (under: Of fir (Abies spp.) and spruce (Picea spp.), of which the smallest cross-sectional dimension is 15 cm or more) (m3).
- 4403.24.01 Of fir (Abies spp.) and spruce (Picea spp.), other: General Free; Special none; Column 2 Free.
- 4403.24.01.04 Pulpwood (under: Of fir (Abies spp.) and spruce (Picea spp.), other) (m3).
- 4403.24.01.12 Telephone, telegraph and electrical power poles (m).
- 4403.24.01.15 Fence posts (under: Poles, piles and posts) (m).
- 4403.24.01.16 Other (under: Poles, piles and posts) (m).
- 4403.24.01.35 Spruce (Picea spp.) (under: Logs and timber) (m3).
- 4403.24.01.42 Other fir; balsam (under: Logs and timber) (m3).
- 4403.24.01.65 Other (under: Of fir (Abies spp.) and spruce (Picea spp.), other) (m3).
- 4403.25.01 Other, of which the smallest cross-sectional dimension is 15 cm or more: General Free; Special none; Column 2 Free.
- 4403.25.01.12 Telephone, telegraph and electrical power poles (m).
- 4403.25.01.15 Fence posts (under: Poles, piles and posts) (m).
- 4403.25.01.16 Other (under: Poles, piles and posts) (m).
- 4403.25.01.40 Douglas-fir (Pseudotsuga menziesii) (m3).
- 4403.25.01.50 Western hemlock (Tsuga heterophylla) (m3).
- 4403.25.01.52 Other hemlock (under: Logs and timber) (m3).
- 4403.25.01.55 Western red cedar (Thuja plicata) (m3).
- 4403.25.01.57 Other cedar (under: Logs and timber) (m3).
- 4403.25.01.64 Other (under: Logs and timber) (m3).
- 4403.25.01.65 Other (under: Other, of which the smallest cross-sectional dimension is 15 cm or more) (m3).
- 4403.26.01 Other (under: Other, coniferous): General Free; Special none; Column 2 Free.
- 4403.26.01.08 Pulpwood (under: Other) (m3).
- 4403.26.01.12 Telephone, telegraph and electrical power poles (m).
- 4403.26.01.15 Fence posts (under: Poles, piles and posts) (m).
- 4403.26.01.16 Other (under: Poles, piles and posts) (m).
- 4403.26.01.40 Douglas-fir (Pseudotsuga menziesii) (m3).
- 4403.26.01.50 Western hemlock (Tsuga heterophylla) (m3).
- 4403.26.01.52 Other hemlock (under: Logs and timber) (m3).
- 4403.26.01.55 Western red cedar (Thuja plicata) (m3).
- 4403.26.01.57 Other cedar (under: Logs and timber) (m3).
- 4403.26.01.64 Other (under: Logs and timber) (m3).
- 4403.26.01.65 Other (under: Other) (m3).
- 4403.41.00.00 Dark Red Meranti, Light Red Meranti and Meranti Bakau (m3): General Free; Special none; Column 2 Free.
- 4403.42.00.00 Teak (under: Other, of tropical wood) (m3): General Free; Special none; Column 2 Free.
- 4403.49.02.00 Other (under: Other, of tropical wood) (m3): General Free; Special none; Column 2 Free.
- 4403.91.00 Of oak (Quercus spp.) (under: Other): General Free; Special none; Column 2 Free.
- 4403.91.00.20 Of red oak (under: Of oak (Quercus spp.)) (m3).
- 4403.91.00.40 Other (under: Of oak (Quercus spp.)) (m3).
- 4403.93.01.00 Of beech (Fagus spp.), of which the smallest cross-sectional dimension is 15 cm or more (m3): General Free; Special none; Column 2 Free.
- 4403.94.01.00 Of beech (Fagus spp.), other (under: Other) (m3): General Free; Special none; Column 2 Free.
- 4403.95.01 Of birch (Betula spp.), of which the smallest cross-sectional dimension is 15 cm or more: General Free; Special none; Column 2 Free.
- 4403.95.01.27 Poles, piles and posts (under: Of birch (Betula spp.), of which the smallest cross-sectional dimension is 15 cm or more) (m3).
- 4403.95.01.30 Other (under: Of birch (Betula spp.), of which the smallest cross-sectional dimension is 15 cm or more) (m3).
- 4403.96.01 Of birch (Betula spp.), other: General Free; Special none; Column 2 Free.
- 4403.96.01.23 Pulpwood (under: Of birch (Betula spp.), other) (m3).
- 4403.96.01.27 Poles, piles and posts (under: Of birch (Betula spp.), other) (m3).
- 4403.96.01.30 Other (under: Of birch (Betula spp.), other) (m3).
- 4403.97.00 Of poplar and aspen (Populus spp.): General Free; Special none; Column 2 Free.
- 4403.97.00.22 Pulpwood (under: Of poplar and aspen (Populus spp.)) (m3).
- 4403.97.00.26 Poles, piles and posts (under: Of poplar and aspen (Populus spp.)) (m3).
- 4403.97.00.65 Of yellow poplar (Liriodendron tulipifera) (m3).
- 4403.97.00.67 Of other poplar; of aspen or cottonwood (m3).
- 4403.98.00 Of eucalyptus (Eucalyptus spp.): General Free; Special none; Column 2 Free.
- 4403.98.00.23 Pulpwood (under: Of eucalyptus (Eucalyptus spp.)) (m3).
- 4403.98.00.28 Poles, piles and posts (under: Of eucalyptus (Eucalyptus spp.)) (m3).
- 4403.98.00.95 Other (under: Of eucalyptus (Eucalyptus spp.)) (m3).
- 4403.99.01 Other (under: Other): General Free; Special none; Column 2 Free.
- 4403.99.01.23 Pulpwood (under: Other) (m3).
- 4403.99.01.28 Poles, piles and posts (under: Other) (m3).
- 4403.99.01.40 Of ash (Fraxinus spp.) (under: Other) (m3).
- 4403.99.01.50 Of western red alder (Alnus rubra) (m3).
- 4403.99.01.55 Of cherry (Prunus spp.) (under: Other) (m3).
- 4403.99.01.60 Of maple (Acer spp.) (under: Other) (m3).
- 4403.99.01.70 Of walnut (Juglans spp.) (under: Other) (m3).
- 4403.99.01.75 Of paulownia (Paulownia spp.) (m3).
- 4403.99.01.95 Other (under: Other) (m3).
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.