HTS Heading 4404
Hoopwood; split poles; piles, pickets and stakes of wood, pointed but not sawn lengthwise; wooden sticks, roughly trimmed but not turned, bent or otherwise worked, suitable for the manufacture of walking-sticks, umbrellas, tool handles or the like; chipwood and the like
All 6 HTS codes under heading 4404 (hoopwood), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 4404
- 4404 Hoopwood; split poles; piles, pickets and stakes of wood, pointed but not sawn lengthwise; wooden sticks, roughly trimmed but not turned, bent or otherwise worked, suitable for the manufacture of walking-sticks, umbrellas, tool handles or the like; chipwood and the like.
- 4404.10.00 Coniferous (under: Hoopwood; split poles; piles, pickets and stakes of wood, pointed but not sawn lengthwise; wooden sticks, roughly trimmed but not turned, bent or otherwise worked, suitable for the manufacture of walking-sticks, umbrellas, tool handles or the like; chipwood and the like): General Free; Special none; Column 2 Free.
- 4404.10.00.40 Fence pickets, palings and rails (kg).
- 4404.10.00.80 Poles, piles and posts (under: Coniferous) (kg).
- 4404.10.00.90 Other (under: Coniferous) (kg).
- 4404.20.00 Nonconiferous (under: Hoopwood; split poles; piles, pickets and stakes of wood, pointed but not sawn lengthwise; wooden sticks, roughly trimmed but not turned, bent or otherwise worked, suitable for the manufacture of walking-sticks, umbrellas, tool handles or the like; chipwood and the like): General Free; Special none; Column 2 Free.
- 4404.20.00.40 Fence pickets, palings and rails (kg).
- 4404.20.00.80 Poles, piles and posts (under: Nonconiferous) (kg).
- 4404.20.00.90 Other (under: Nonconiferous) (kg).
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.