HTS Heading 4405
Wood wool (excelsior); wood flour
The HTS code under heading 4405 (wood wool (excelsior)), with its duty rates from the 2026 HTS Revision 23. General duty 3.2%.
Every line of heading 4405
- 4405.00.00.00 Wood wool (excelsior); wood flour (kg): General 3.2%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 33 1/3%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.